---
product_id: 314227980
title: "The VoIP Lounge Handset (includes 9' cord with long lead) for Mitel 5300 Series IP Phones 5304 5312 5320 5320e 5324 5330 5330e 5340 5340e and 5360"
brand: "the voip lounge"
price: "46675CFA"
currency: XOF
in_stock: true
reviews_count: 5
category: "The Vo Ip Lounge"
url: https://www.desertcart.sn/products/314227980-the-voip-lounge-handset-includes-9-cord-with-long-lead
store_origin: SN
region: Senegal
---

# 9' extra-long cord for flexible reach Corded electric for uninterrupted power Sleek black design fits any professional setup The VoIP Lounge Handset (includes 9' cord with long lead) for Mitel 5300 Series IP Phones 5304 5312 5320 5320e 5324 5330 5330e 5340 5340e and 5360

**Brand:** the voip lounge
**Price:** 46675CFA
**Availability:** ✅ In Stock

## Summary

> 📞 Stay connected, stay ahead—because your calls deserve the best!

## Quick Answers

- **What is this?** The VoIP Lounge Handset (includes 9' cord with long lead) for Mitel 5300 Series IP Phones 5304 5312 5320 5320e 5324 5330 5330e 5340 5340e and 5360 by the voip lounge
- **How much does it cost?** 46675CFA with free shipping
- **Is it available?** Yes, in stock and ready to ship
- **Where can I buy it?** [www.desertcart.sn](https://www.desertcart.sn/products/314227980-the-voip-lounge-handset-includes-9-cord-with-long-lead)

## Best For

- the voip lounge enthusiasts

## Why This Product

- Trusted the voip lounge brand quality
- Free international shipping included
- Worldwide delivery with tracking
- 15-day hassle-free returns

## Key Features

- • **Seamless Compatibility:** Works flawlessly with Mitel 5300 Series and select 5200 models—no guesswork
- • **Plug & Play Reliability:** Corded electric power ensures zero downtime during critical calls
- • **Professional Minimalism:** Sleek black handset blends into any modern office aesthetic with understated style
- • **Extended Reach, No Limits:** 9-foot cord with extra-long lead keeps you connected without tethering stress
- • **Official Quality Assurance:** Look for The VoIP Lounge logo—guaranteed brand-new, boxed, and ready to perform

## Overview

The VoIP Lounge Handset is a brand-new, officially branded replacement handset designed for Mitel 5300 Series IP Phones and select 5200 models. Featuring a 9-foot cord with an extra-long lead, it offers flexible reach and reliable corded electric power. Its sleek black design complements professional environments, ensuring seamless integration and uninterrupted communication.

## Description

Brand New, individually boxed, The VoIP Lounge Replacement Handset for Mitel 5300 Series IP Phones including 5304, 5312, 5320, 5320e, 5324, 5330, 5330e, 5340, 5340e, and 5360. Cord length is 9 feet fully stretched and approximately 15 inches coiled, with an extra long lead on one end. Official The VoIP Lounge brand - Look for The VoIP Lounge logo on the box

Review: Yes, you can hear me now. Great replacement headset
Review: Cheap Swap Out

## Features

- Brand New - Individually Boxed
- Black Color
- Also compatible with Mitel 5212 and 5224 Phones
- Official The VoIP Lounge brand - Look for The VoIP Lounge logo on the box

## Technical Specifications

| Specification | Value |
|---------------|-------|
| ASIN | B07CMG3Q6Z |
| Answering System Type | Digital |
| Best Sellers Rank | #111,021 in Electronics ( See Top 100 in Electronics ) #175 in VoIP & Skype Phones |
| Brand | The VoIP Lounge |
| Color | Black |
| Colour | Black |
| Compatible Devices | Mitel 5300 Series IP Phones, Mitel 5212 and 5224 Phones |
| Customer Reviews | 4.4 out of 5 stars 32 Reviews |
| Dialer Type | Single Keypad |
| Dialler type | Single Keypad |
| Enclosure Material | Plastic |
| Is there Caller ID | No |
| Manufacturer | The VoIP Lounge |
| Material | Plastic |
| Multiline Operation | Single-Line Operation |
| Power Source | Corded Electric |
| Power source | Corded Electric |
| Telephone Type | Corded |
| Telephone type | Corded |

## Product Details

- **Answering System Type:** Digital
- **Brand:** The VoIP Lounge
- **Caller Identification:** No
- **Color:** Black
- **Dialer Type:** Single Keypad
- **Material:** Plastic
- **Multiline Operation:** Single-Line Operation
- **Power Source:** Does Not Apply
- **Telephone Type:** Corded

## Images

![The VoIP Lounge Handset (includes 9' cord with long lead) for Mitel 5300 Series IP Phones 5304 5312 5320 5320e 5324 5330 5330e 5340 5340e and 5360 - Image 1](https://m.media-amazon.com/images/I/41At5RMfTTL.jpg)

## Customer Reviews

### ⭐⭐⭐⭐⭐ Yes, you can hear me now. Great replacement headset
*by C***N on 4 November 2025*



### ⭐⭐⭐⭐⭐ Cheap Swap Out
*by B***S on 8 October 2025*



### ⭐⭐⭐⭐⭐ No more static
*by T***Y on 7 August 2024*



## Frequently Bought Together

- The VoIP Lounge Handset with Curly Cord with Long Lead for Mitel 5300 Series IP Phones 5304 5312 5320 5320e 5324 5330 5330e 5340 5340e and 5360
- Telephone Cord, Phone Cord,Handset Cord, Black, 2 Pack, Universally Compatible
- Mitel 5330e IP Phone (50006476)

---

## Why Shop on Desertcart?

- 🛒 **Trusted by 1.3+ Million Shoppers** — Serving international shoppers since 2016
- 🌍 **Shop Globally** — Access 737+ million products across 21 categories
- 💰 **No Hidden Fees** — All customs, duties, and taxes included in the price
- 🔄 **15-Day Free Returns** — Hassle-free returns (30 days for PRO members)
- 🔒 **Secure Payments** — Trusted payment options with buyer protection
- ⭐ **TrustPilot Rated 4.5/5** — Based on 8,000+ happy customer reviews

**Shop now:** [https://www.desertcart.sn/products/314227980-the-voip-lounge-handset-includes-9-cord-with-long-lead](https://www.desertcart.sn/products/314227980-the-voip-lounge-handset-includes-9-cord-with-long-lead)

---

*Product available on Desertcart Senegal*
*Store origin: SN*
*Last updated: 2026-04-24*